Wednesday, the pool company showed up. They were supposed to come in on Monday, then Tuesday. Their truck broke down on Wednesday and they didn't arrive until the afternoon. They layed the pool out on Wednesday and started digging Thursday morning. Their backhoe broke down Thursday morning and they are waiting on a part to come in.
Kerry Turner has most of the interior piers layed out and most of the form boards set for the building slab.
Jerime with Bailey installed out night watchman outside the office trailer, layed some conduit to the north end of the property and adjusted the conduit that he had running up into room #127.
Cleaned up the site and thew away all of the trash that was in the connex.
Built the frame and construction sign and dug the holes for it. Built a box around our R.P.Z. and stuffed it full of insulation.
10/28/08
The pool company is still waiting on a part for their backhoe.
Kerry Turner is diffing for the interior piers and footings.
Jerime with Bailey is adjusting conduit for the electric, telephone and cable.
John is in a meeting with the MEP guys and the framing and sheetrock at the Microtel.
Shawn Stone with Newstone Door and specialty installations came by the office to look at prints for the Country Inn and Suites, La Quinta and Microtel Searcy.
Supposed to meet with Brett Acres around 11:20 to give him his check and have him sign and notarize a lien waiver.
Checked on John's computer at Best Buy. They said the hardware tests were going well. They may need to run some software test as well. They will call John this evening to give him a status report.
Joey, Alan, Chase John and the Patels had a meeting at our office on site.
Two fellows from a granite installation company came by around 1:00 to meet with Alan and Joey and John.
Brett Acres came by to sign and notarize the lien waiver and pick up his check for hauling off out spoils.
an RSC rep. came by the office to check and see if we needed anything.
Jerime with Bailey told me that he wanted to know when and who was digging the elevator pit. He wants to run conduit in the concrete walls.
10/29/08
Kerry Turner had about 10 guys on site to form and pour part of the north parking lot and dig pads for the piers and footers.
Jarrod Pavet is setting points for the curbs on the north parking lot.
Jerime and Brad with Bailey are trenching for the new telephone conduit that is running to the north east corner pedestal per ATT.
Seaside Poos showed up on site around 10:00. Edwardo took down our construction fencing and drove the dump truck on the Amity Rd. approach.
10/29/08
Todd McWilliams came by the site around 10:00 to look over the placement of the dry block wall along the south and east sides of the building.
The hard drive on John's computer is failing. I spent 30 minutes on the phone with customer service ordering recovery discs for the operating system. They should be shipped to Best Buy on the 31st. We purchased a 250g external HD to back up all out data.
Seaside pools dug the entire swimming pool.
Todd McWilliams and Brad with Advanced Sprinkler came out and met with Conway Block to discuss the dry block wall on the south and east sides of the building.
10/30/08
Kerry Turner is cutting control points in the concrete that he poured yesterday. They are still digging footers and piers in the building pad. Mic is having to be very careful because of all of the underground plumbing and conduit that is stubbed up out of the ground.
Phillip from a water proofing and caulking company came by to look at the cracks in the parking lot. they will come out after we are finished with everything and caulk all the cracks at once.
Seaside pools finished digging the whirl pool and swimming pool yesterday. They are laying gravel down inside the pool and will be running the pipes that they need to run into the pool mechanical room. John and I layed out the two back corners of the mechanical room.
Brett Acre is bringing out 2 loads of SB2 for Kerry to start spreading on the building pad.
Moses Plumbing is on site to move and fix a couple of pipes. They'll be getting ready to set floor drains, the elevator pit pump, and finish everything that goes under the slab. This also includes pipes running to the pool for water and drains.
10/31/08
Turner Construction is on site spreading gravel and digging interior footings.
Jerime and Brad with Bailey is on site putting in Conduit for under slab and floor plugs.
Todd and Brad with Advanced Sprinkler have started digging their footer for the retaining wall.
Alex came by the office and had a long meeting with John.
Conway Corp. came out to meet with Todd and Brad and me about their easment on the sewer line. There may be an issue with building a perminant structure on top of the sewer line such as the sundeck and the retaining wall. We met with Brett McDaniel who is the water system engineer and Leslie Guffey. They will try to have a resolution by Monday.
I picked up John's computer from Best Buy.
I moved John's furniture into his apartment and put his bed together and let his computer there for him.