Wednesday, November 5, 2008

11/5/08

Weather: Mostly Clear, highs in the high 70s.


Jarred Pavatt came on site about 7 am. He's still setting points for anchor bolts, and the elevator pit.


Turner Construction is on site building knock outs and templates for the anchor bolts.


Seaside pools is going to pour the floors of the whirl pool and swimming pool this morning. They're waiting on an inspection of the ground wires before they cam spray gunnite on the walls.


Advanced Sprinkler is working on the dry block wall going in on the south and east sides of the building. An engineer from the city is supposed to come and look at the part of the storm drain wall that is falling in on the east side.


John, Alan, Alex and Joey had a meeting over lunch.



John, Joey, Alan, the Patels, the bank, and engineers met on site for a long time this afternoon.



Turner Construction poured 75 % of the interior footers and peirs and set anchore bolts.

No comments: