Monday, November 24, 2008

11/18/08 - 11/24/08

11/18/08
From Country Inn and Suites

Weather: Sunny and cold. Highs in the 40s


Turner Construction is on site cleaning up their trade. The three pier points on the meeting room area on the east wall are off. They are about two feet too far to the east. Jared is supposed to be coming out to see who set the points. Kerry will have to cut and hammer the needed area.


Moixx Construction is on site laying out their plan and measuring and popping lines on the slab.


Ed Wiley with Wilson Bros. came by to see when they would need to come back out and backfill behind the curbs. John said he couldn't give an answer rightn now.


Moixx found some anchor bolt points that where out of place. Jared Pavett came out to verify the problem.


Kerry rented a jack hammer to cut out some concrete in a couple of spots.


Moixx layed out their stuff and should be ready to hang steel tomorrow.


Seaside Pools is setting the coping around the whirl pool and swimming pool.


11/19/08


Seaside Pools is setting the coping around the swimming and whirl pools. they had to wait until later in the morning because of the tempature.


Moixx hung iron columns on the south end of the building and finished laying out their lines.

Turner Construction was chipping some concrete and drilling the correct spot for the anchor bolt points.


I left around 11:30 for a meeting in Ft. Smith with Joey and Alan.


John left around 2:00 to go home for a funeral. Gary Farris is on site to supervise.


11/20/08


John is in Bentonville for a funeral. He'll be back in town this evening.



Moixx is on site setting columns. Mike Andrews had to go to Fastenal to get something to sue for shims.


Seaside Pools is grouting the coping around the pool.


Moses Plumbing is here installing the floor drain around the pool and connecting the fill and drain lines to and from the pool.


Turner Construction is chipping and cutting concrete in the elevator pit. They are getting ready to pour concrete around the pools and mechanical room tomorrow.


Jerime with Bailey came out to put a hard nipple on the stub out for the temporary power. Seasid pools wanted to run conduit for their lights later. Jerime layed the spot out for them.


Conway corp. came out and made our 6" tap into the man hole.

Kevin with Moses gave me a copy of the CAD file lay out sheet that they layed everything off of. The framers can use it measure off of. It is not to scale.


11/21/08


Turner Construction poured the remainder of the slab around the pool area. It took 70 yds. They put 2% calcium in the mix. They worked the slab until around 8 in the morning.


Moixx Construction brought in a few more guys to help hang steel.


Kevin with Moses connected the building sewer to the tap that Conway Corp. made on Thursday.


Southland's framing crew was here snapping lines and laying things out this afternoon.


I unloaded 7 lumber trucks yesterday and today.


11/24/08


Weather: Mostly clouldy. Showers in the morning. Highs in the upper 50s. Wet and muddy conditions.


Moixx Construction is hanging steel. they have a crew of 3 guys on site.


Turner Construction is on site cleaning up misc. stuff.


Alan and John met with the Patels around 11:00


Todd with Advanced Sprinkler is on site with his crew working on the the dry block wall in the back.




No comments: